Every state-changing event on this project, newest first. Tenant-scoped via row-level security.
Submittal SUB-008: approved → closed (close & distribute)
Submittal SUB-008: reviewer approved (parallel) -> approved - E2E TEST - Parallel reviewer approval: mock-up meets visual and performance c...
Submittal SUB-008: Submitted for review (draft -> open) - E2E TEST - Submitting curtain wall mock-up for parallel consultant review. Al...
Submittal SUB-008 drafted (mock_up, parallel review, 1 reviewer)
Submittal SUB-005: revision 0 opened (chain reset)
Submittal SUB-005: reviewer revise resubmit (sequential) -> in_review - E2E TEST - Revise & resubmit: balustrade fixing bracket spacing exceeds 900mm...
Submittal SUB-005: reviewer added to chain
Submittal SUB-001: approved → closed (close & distribute)
Submittal SUB-001: reviewer approved (sequential) -> approved - E2E TEST - Step 1 structural review: framing gauge and connections conform to...
Submittal SUB-001: reviewer added to chain
RFI closed · cost impact no · schedule impact yes
RFI manager set to user a0eebc99-9c0b-4ef8-bb6d-6bb9bd380a11
RFI-019 raised - E2E TEST - Grid line A/B drawing discrepancy (formal UAT) (from template)
PO PO-E2E-2 drafted: E2E TEST - Curtain wall first shipment
RFQ RFQ-E2E-2 drafted: E2E TEST - Facade & curtain wall RFQ
SOV line · 1.01 · E2E TEST - Curtain wall supply & install, full facade · $485000.00
Created subcontract contract SC-E2E-FACADE-01
CPM recalculated · 1 critical task(s) · 13d total
Dependency removed (FS)
CPM recalculated · 0 critical task(s) · 0d total · cycle detected
Dependency added · predecessor db361189 (FS, lag 0)
Dependency added · predecessor d3109579 (FS, lag 0)
CPM recalculated · 1 critical task(s) · 13d total
CPM task 1.2 added · E2E TEST - Tower A foundation reinforcement
Project access role: Project Manager → Contract Administrator for Local Dev User <dev@idc.local>
Submittal SUB-007: Closed and distributed (approved -> closed) - E2E TEST close & distribute: Approved as noted. Issued to fabricator for prod...
Submittal SUB-007: reviewer approved as noted (sequential) -> approved - E2E TEST reviewer decision: Approved as noted. Confirm handrail bracket spaci...
Submittal SUB-007: reviewer added to chain
OBS-003 status closed -> open (reopened)
OBS-003 status open -> closed
OBS-003 raised - E2E TEST - Unguarded penetration at Level 2 core
CO-001 raised - E2E TEST - Lift O&M manual + commissioning records
Field "Worker full name" (text) added to "E2E TEST - Site induction checklist"
Form template "E2E TEST - Site induction checklist" created
Created head-contract variation VAR-008 (E2E TEST - Additional drainage to basement ramp)
ACT-001 raised - E2E TEST - Confirm shop drawing dims with structural engineer
RFI closed · cost impact no · schedule impact no
RFI manager set to user a0eebc99-9c0b-4ef8-bb6d-6bb9bd380a11
RFI-018 raised - E2E TEST - Confirm slab edge detail at Grid C-4
TM-001 created - E2E TEST - Extra excavation to rock, grid C4
DC-001 created - E2E TEST - Crane hire week 23
Toolbox talk scheduled · TBT-004 E2E TEST - Pre-shift briefing: crane exclusion zones
COR-001 opened - E2E TEST - Request for clarification on hydraulic set-out
CPM recalculated · 1 critical task(s) · 11d total
CPM task 1.1 added · E2E TEST - Tower A foundation excavation
OBS-002 status open -> closed
OBS-002 raised - E2E TEST - Temporary edge protection missing at Level 3 void
RFI closed · cost impact no · schedule impact no
MTG-001 created - E2E TEST - Weekly site coordination meeting
PUNCH-001 raised - E2E TEST - Chipped tile at lobby entrance