Closed 2/6/26, 11:54 amschedule impact
E2E TEST close: Drawing A governs; architect issuing SK-12. Resolved with 2-day programme review, no cost impact. Closed by UAT.
Schedule impact: 2-day setout review while SK-12 is issued; no downstream critical-path impact.
Formal project answer. Once sent, this is treated as the contractual response.
E2E TEST official response: Drawing A (A-201 rev C) governs over Drawing B (S-110 rev A) at grid line A/B. Architect to issue revised setout SK-12. No cost impact; 2-day programme review only.
Working discussion and draft responses. This thread is informal and can evolve.
No discussion comments yet.
Link to a hosted file (SharePoint, OneDrive, etc.). To upload a file directly, use the file picker below.
No attachments.
Variations that originated from this RFI. Capturing the link preserves the audit trail end-to-end (RFI raised, cost impact flagged, variation issued).
No variations linked yet.
None.
None.
Closed 2/6/26, 11:54 amschedule impact
E2E TEST close: Drawing A governs; architect issuing SK-12. Resolved with 2-day programme review, no cost impact. Closed by UAT.
Schedule impact: 2-day setout review while SK-12 is issued; no downstream critical-path impact.
None yet.
None yet.
Formal project answer. Once sent, this is treated as the contractual response.
E2E TEST official response: Drawing A (A-201 rev C) governs over Drawing B (S-110 rev A) at grid line A/B. Architect to issue revised setout SK-12. No cost impact; 2-day programme review only.
Working discussion and draft responses. This thread is informal and can evolve.
No discussion comments yet.
Link to a hosted file (SharePoint, OneDrive, etc.). To upload a file directly, use the file picker below.
No attachments.
Archiving keeps history and hides this RFI from the register.