Formal project answer. Once sent, this is treated as the contractual response.
E2E TEST official response: Slab edge thickening detail confirmed per S-101 Rev C. Reinforcement lap = 600mm. No further action required. (Automated deep-test response.)
Working discussion and draft responses. This thread is informal and can evolve.
No discussion comments yet.
Link to a hosted file (SharePoint, OneDrive, etc.). To upload a file directly, use the file picker below.
Variations that originated from this RFI. Capturing the link preserves the audit trail end-to-end (RFI raised, cost impact flagged, variation issued).
No variations linked yet.
None.
None.
Closed 2/6/26, 10:45 am
E2E TEST closure: Detail confirmed, response acknowledged. No cost or schedule impact. Closing as part of automated deep-test lifecycle.
None yet.
None yet.
Formal project answer. Once sent, this is treated as the contractual response.
E2E TEST official response: Slab edge thickening detail confirmed per S-101 Rev C. Reinforcement lap = 600mm. No further action required. (Automated deep-test response.)
Working discussion and draft responses. This thread is informal and can evolve.
No discussion comments yet.
Link to a hosted file (SharePoint, OneDrive, etc.). To upload a file directly, use the file picker below.
Archiving keeps history and hides this RFI from the register.