Penetrations to be sleeved 150mm; coordinate with PT band setout per SK-12. Architect to confirm fire-rating.
Working discussion and draft responses. This thread is informal and can evolve.
No discussion comments yet.
Link to a hosted file (SharePoint, OneDrive, etc.). To upload a file directly, use the file picker below.
No attachments.
Variations that originated from this RFI. Capturing the link preserves the audit trail end-to-end (RFI raised, cost impact flagged, variation issued).
No variations linked yet.
None.
None.
Closed —
None yet.
None yet.
Formal project answer. Once sent, this is treated as the contractual response.
Penetrations to be sleeved 150mm; coordinate with PT band setout per SK-12. Architect to confirm fire-rating.
Working discussion and draft responses. This thread is informal and can evolve.
No discussion comments yet.
Link to a hosted file (SharePoint, OneDrive, etc.). To upload a file directly, use the file picker below.
No attachments.
Variations that originated from this RFI. Capturing the link preserves the audit trail end-to-end (RFI raised, cost impact flagged, variation issued).