Closed 6/6/26, 12:18 pm
AUDIT 2026-06-06: RFI #15 closed cleanly after official response. Slab edge accepted as drawn; no cost/schedule impact. Test closure only.
Formal project answer. Once sent, this is treated as the contractual response.
AUDIT 2026-06-06 OFFICIAL: Slab edge per S-201 Rev B — 30mm cover top, 50mm cover bottom, 250mm turn-down per detail 4/S-301. This is the contractual response. Test only.
Working discussion and draft responses. This thread is informal and can evolve.
AUDIT 2026-06-06: Slab edge confirmed per S-201 Rev B — 30mm cover top, 50mm cover bottom, 250mm turn-down per detail 4/S-301. Test response only.
Link to a hosted file (SharePoint, OneDrive, etc.). To upload a file directly, use the file picker below.
No attachments.
Variations that originated from this RFI. Capturing the link preserves the audit trail end-to-end (RFI raised, cost impact flagged, variation issued).
No variations linked yet.
None.
None.
Closed 6/6/26, 12:18 pm
AUDIT 2026-06-06: RFI #15 closed cleanly after official response. Slab edge accepted as drawn; no cost/schedule impact. Test closure only.
None yet.
None yet.
Formal project answer. Once sent, this is treated as the contractual response.
AUDIT 2026-06-06 OFFICIAL: Slab edge per S-201 Rev B — 30mm cover top, 50mm cover bottom, 250mm turn-down per detail 4/S-301. This is the contractual response. Test only.
Working discussion and draft responses. This thread is informal and can evolve.
AUDIT 2026-06-06: Slab edge confirmed per S-201 Rev B — 30mm cover top, 50mm cover bottom, 250mm turn-down per detail 4/S-301. Test response only.
Link to a hosted file (SharePoint, OneDrive, etc.). To upload a file directly, use the file picker below.
No attachments.
Archiving keeps history and hides this RFI from the register.