DEMO-1 · RFI #21
Title
*
(required)
Question / description
For the slab-on-ground at gridlines B and C, please confirm the required cover to the top reinforcement. Drawing S-201 Rev B notes 30mm on the typical detail, but detail 5/S-301 shows 40mm at the doweled construction joint. Which prevails at the joint? Test RFI raised during functional audit rerun.