INSP-003 E2E TEST - Pre-pour inspection slab L2
Inspections
INSP-003 · E2E TEST - Pre-pour inspection slab L2
Pre-pour · Level 2 slab, Grid A-D
distributed
Scheduled
12 June 26, 07:00 pm
Completed
02 June 26, 12:19 pm
Score
80.00%
NCRs raised
1
Distributed 02 June 26, 12:20 pm.
Findings
Reinforcement set out per drawing
pass
Cover blocks installed
pass
Embeds positioned
pass
Pour stops in place
pass
Surveyor sign-off received
E2E TEST - FAIL: surveyor sign-off not received prior to scheduled pour. Raise defect.
fail