INSP-002 Pre-pour inspection — slab L1
Inspections
INSP-002 · Pre-pour inspection — slab L1
IDC Pre-Pour Checklist · Level 1 slab
distributed
Scheduled
02 June 26, 03:55 am
Completed
04 June 26, 10:01 am
Score
0.00%
NCRs raised
1
Distributed 04 June 26, 10:01 am.
Findings
Reinforcement cover & bar spacing to engineer's drawings
QA audit: deliberate FAIL to test fail-item -> NCR/defect cascade. Bottom bar cover short by ~15mm at grid E5; rectify before pour.
fail