Automated E2E test change event. Revised hydraulic design (RFI-014) may require two additional sump pumps to the lift pit. ROM pending confirmation of pit dimensions.
Change event/#5
Automated E2E test change event. Revised hydraulic design (RFI-014) may require two additional sump pumps to the lift pit. ROM pending confirmation of pit dimensions.
Convert this priced change event into a formal variation. The scope, ROM value and FX are carried across; the new variation starts in draft for commercial pricing.