Rejected with mandatory redesign comments.
Record-level transitions. Every transition needs a note; notes land on the audit trail.
in_review -> open - Local Dev User on 2/6/26, 12:02 pm
E2E TEST - Rev B: bracket centres reduced to 750mm, edge anchor re-detailed, structural calcs attached per reviewer comments.
E2E TEST - Rev B: bracket centres reduced to 750mm, edge anchor re-detailed, structural calcs attached per reviewer comments.
Current accountable responder: Local Dev User. The chain advances this automatically; override here if needed.
Read-only recipients notified when the submittal is distributed.
No distribution recipients yet.
Rejected with mandatory redesign comments.
Quick action; prefer the Close action in Manager actions so the audit trail captures a note.
No comments yet. Drop a note for the team — questions, context, or decisions captured here stay visible to everyone with access to this record.