E2E TEST close note: Membrane spec confirmed (Ardex WPM 300, 150mm upturn). Hydraulic conflict resolved via A-210 Rev C. No cost or schedule impact. Closed by automated E2E test.
Formal project answer. Once sent, this is treated as the contractual response.
E2E TEST official response: Use Ardex WPM 300 liquid membrane with a 150mm upturn at all planter boxes per spec 07 14 00. Drawing A-210 Rev C supersedes the conflicting hydraulic detail; coordinate penetrations before pour. Test data only.
Working discussion and draft responses. This thread is informal and can evolve.
No discussion comments yet.
Link to a hosted file (SharePoint, OneDrive, etc.). To upload a file directly, use the file picker below.
No attachments.
Variations that originated from this RFI. Capturing the link preserves the audit trail end-to-end (RFI raised, cost impact flagged, variation issued).
No variations linked yet.
None.
None.
Closed 2/6/26, 10:21 am
E2E TEST close note: Membrane spec confirmed (Ardex WPM 300, 150mm upturn). Hydraulic conflict resolved via A-210 Rev C. No cost or schedule impact. Closed by automated E2E test.
None yet.
None yet.
Formal project answer. Once sent, this is treated as the contractual response.
E2E TEST official response: Use Ardex WPM 300 liquid membrane with a 150mm upturn at all planter boxes per spec 07 14 00. Drawing A-210 Rev C supersedes the conflicting hydraulic detail; coordinate penetrations before pour. Test data only.
Working discussion and draft responses. This thread is informal and can evolve.
No discussion comments yet.
Link to a hosted file (SharePoint, OneDrive, etc.). To upload a file directly, use the file picker below.
No attachments.
Archiving keeps history and hides this RFI from the register.