Formal project answer. Once sent, this is treated as the contractual response.
Official response: install shim plate detail F-22.
Close requires an official response and a resolution note. Capture cost / schedule impact flags here so commercial and programme can pick this up.
Working discussion and draft responses. This thread is informal and can evolve.
Site note captured and forwarded to consultant.
Link to a hosted file (SharePoint, OneDrive, etc.). To upload a file directly, use the file picker below.
No attachments.
Variations that originated from this RFI. Capturing the link preserves the audit trail end-to-end (RFI raised, cost impact flagged, variation issued).
No variations linked yet.
None.
None.
None yet.
None yet.
Formal project answer. Once sent, this is treated as the contractual response.
Official response: install shim plate detail F-22.
Close requires an official response and a resolution note. Capture cost / schedule impact flags here so commercial and programme can pick this up.
Working discussion and draft responses. This thread is informal and can evolve.
Site note captured and forwarded to consultant.
Link to a hosted file (SharePoint, OneDrive, etc.). To upload a file directly, use the file picker below.
No attachments.
Archiving keeps history and hides this RFI from the register.