Closed 4/6/26, 5:17 am
AUDIT E2E resolution: Duct rerouted 200mm east per official response. No cost/programme impact. Coordination model updated. Closed.
Formal project answer. Once sent, this is treated as the contractual response.
OFFICIAL RESPONSE (AUDIT E2E): Reroute the stair pressurisation duct 200mm to the east per M-121 Rev C revised setout. Sprinkler main remains as-built. No cost impact; nil programme impact. Proceed on this basis.
Working discussion and draft responses. This thread is informal and can evolve.
AUDIT E2E discussion note: Reviewed coordination model 2026-04-18. Sprinkler main appears to have ~150mm clash. Awaiting structural confirmation before official response.
Link to a hosted file (SharePoint, OneDrive, etc.). To upload a file directly, use the file picker below.
No attachments.
Variations that originated from this RFI. Capturing the link preserves the audit trail end-to-end (RFI raised, cost impact flagged, variation issued).
No variations linked yet.
None.
None.
Closed 4/6/26, 5:17 am
AUDIT E2E resolution: Duct rerouted 200mm east per official response. No cost/programme impact. Coordination model updated. Closed.
None yet.
None yet.
Formal project answer. Once sent, this is treated as the contractual response.
OFFICIAL RESPONSE (AUDIT E2E): Reroute the stair pressurisation duct 200mm to the east per M-121 Rev C revised setout. Sprinkler main remains as-built. No cost impact; nil programme impact. Proceed on this basis.
Working discussion and draft responses. This thread is informal and can evolve.
AUDIT E2E discussion note: Reviewed coordination model 2026-04-18. Sprinkler main appears to have ~150mm clash. Awaiting structural confirmation before official response.
Link to a hosted file (SharePoint, OneDrive, etc.). To upload a file directly, use the file picker below.
No attachments.